background

Lifting of ECO Modules in Glasgow, Scotland

HLI was asked to carry out an operation involving the lifting of ECO modules in Glasgow, Scotland. The team was responsible for the design and operation of a vertical transport system utilizing hydraulic strand jacks with a maximum capacity of 16 000 kN.

Scope of Work

  • Total weight of a single module: 70 tons,
  • Lifting height: 25 m,
  • Installation and reinstallation of the supplied system,
  • Full operation of the lifting system.

Back to top of page